Kinex Speed Challenge
Would you like to react to this message? Create an account in a few clicks or log in to continue.

Jenna Lerminiaux

Go down

Jenna Lerminiaux Empty Jenna Lerminiaux

Post by jlerm19 Tue Mar 01, 2016 11:52 am

My group is on step six of the Engineering Design process. We have finished our first prototype and are ready to test it. Our car has two big back wheels and one small wheel in the middle front. We hope that this with give it more gravitational potential energy seeing as its at an angle. Also we added the other two large tire on top of the car to give it more mass to propel forward. We finished it off by adding as much to the bass as we could so it wouldn't fall apart on the ramp.

jlerm19

Posts : 9
Join date : 2016-02-25

Back to top Go down

Back to top

- Similar topics

 
Permissions in this forum:
You cannot reply to topics in this forum